2006, August- Beginning of the Taipei Metropolitan MRT System CG590C Section Bidding Construction of Sung-San Line
CG590C section bidding belongs to the east section of the Taipei MRT Sung-San Line; the Sung-Sang Line will be connected from Hsin-Tien Line, Hsiao-Nan-Men Line and then from the west side of Si-Men Station of Nang-Kang Line, it goes passing Chung-Hua Road to Ta-Cheng Street; then moving north through Tseng-Chiu Road and turning in Ten-Sui Road to connect to Nang-King West Road. Next, the route will move eastern along Nang-King West Road, Nang-King East Road and then transit in Section 4 of Ba-Te Road and go further east till the Rear Station Square of Taiwan Railway Sung-San Station. The planned route length is about 8.5 km, there are 9 underground stations along the line including Si-Men Station; the whole line will be built underground. The Sung-San Line is divided into three civil construction section biddings and one mechanic-electrical system bidding; after it completes, the line could be connected to Nang-Kang Line, Tam-Sui Line and Mu-Cha Line for transit transportation in addition to being connected to Hsin-Tien Line for operation. At the east terminal of Sung-San Station, it could be connected in series with Taiwan Railway Sung-San Station; this will put the services of MRT system and Taiwan Railway together. The construction range of CG590C section bidding starts western from the east of G19 City Stadium at cross exit of Bei-Ning Station and Nan-King East Road to the working well at cross section of the G22 Sung-San Station Tail Track Segment located at the cross section of Ba-Te Road and West of Yu-Cheng Street as the eastern boundary; the total length is about 3.02km. This section bidding includes G21 and G22 two underground stations, one cross-transit line, one tail track working well and three segments of tunnels that use TBM for construction.  

The
CG590C section bidding is anticipated to be completed for transportation in the October end of 2102; by the time, the transit time from Sung-San Station to Si-Men Station will take about 15 minutes. The MRT is going to bring a multitude of people stream, money stream; the business activities along the MRT line are expected to increase and will drive the appreciation of real estate, it is expected to make great contribution to the local prosperity.

Besides, in order to conform to the (government) policy, when the MRT construction is in the process, common conduit will be constructed along the route. The common conduit of this section bidding starts western from the east power delivery split terminal of Bei-Ning Road G19 Station and goes in east direction along section 4 ~ section 5 of Nan-King East Road and ends at Ta-Tu Road Cross; the entire route length is roughly 1.72 km. After completing, it could cut down the times of road digging along this route in the future to reduce the environmental pollution caused by the said construction and to maintain the smoothness of the road traffic as well as the transmission quality of the conduit; it could extend the road lifecycle and create a neat city scene to greatly enhance the living quality.

In the years to come, it is anticipated that, under the common efforts and cooperation among the MRT Construction Bureau, the Eastern Construction Division and DaCin Construction Corporation and the (Detail Design of) Chung-Hsing Construction Consultant Company and by holding the superior tradition of  'First for Safety and Priority for Environment' advocated by MRT Bureau, the construction could be completed with the quality as wished.
     
  
Other Messages
  
   Beam-raising Ceremony for HongSheng Construction Corp.-ShuiYue Residence project on Nov. 2, 2017
   Groundbreaking Ceremony for New Deantronics -Chiayi Factory Project on Jun.6,2017
   Groundbreaking Ceremony for Himax Tree Valley Park Plant Phase 2 construction project on March 12 2017
   Groundbreaking Ceremony for I-Sunny Co. Ltd.- LongJiang Road Hotel project on Dec. 30, 2016
   Groundbreaking Ceremony for JSL Group- Beautiful Mountains (MeiLiShanLin) residence project on Dec. 24, 2016
   Groundbreaking Ceremony for miscellaneous works of Kaohsiung Public Library (main library) Art and Creation Hall project on Dec. 18, 2016
   Beam-raising Ceremony for Ocean Palace Residence project on Oct. 29, 2016
   Beam-raising Ceremony TSMC 15P6 plant construction project on Oct. 7,2016
   Groundbreaking Ceremony for PinYang Development Corp.-Just Sleep Sanchong Hotel project on Jun. 27, 2016
   Beam-raising Ceremony for TSMC 15P5 plant construction project on Apr. 1, 2016
   Groundbreaking Ceremony for TSMC 15P6 plant construction project Feb. 21, 2016
   Beam-raising Ceremony for ZhongLun Market BOT project Nov. 13, 2015
   Groundbreaking Ceremony for PinYang Development Corp.-Diho Garden residence project on Oct. 8, 2015
   Beam-raising Ceremony for FuDu New DanFeng section residence project on Oct. 7, 2015
   Beam-raising ceremony for Palace Ocean (TienYi) residence project on Sep. 20, 2015
   Groundbreaking Ceremony for HongSheng Construction Corp.-ShuiYue residence project on Jul. 14, 2015
   Groundbreaking Ceremony for TSMC 15P5 plant construction project on Jun. 12, 2015
   Groundbreaking Ceremony for Ocean City Heart PH3-Central Garden residence project on Mar. 15, 2015
   Groundbreaking Ceremony for united developing building project of Taipei MRT ZhonShang Station exit no.1 on Dec. 11, 2014
   Beam-raising Ceremony for Taiwan Sanyo(Sanlux) Shulin Plant construction project on Nov. 28, 2014
   Beam-raising ceremony for Ambassador residence construction project on Nov. 4, 2014
   Groundbreaking Ceremony for Ocean Palace residence project on Jul. 19, 2014
   Beam-raising Ceremony for HaiJu Construction Co. Ltd.-Dazhi FengHui construction project on Mar. 28, 2014
   Groundbreaking Ceremony for Taiwan Sanyo(Sanlux) Shulin plant on Jun. 17, 2014
   Beam-raising Ceremony for FuDu New DanFeng section residence project on Oct. 7, 2015
   Groundbreaking Ceremony for HaiJu Construction Co. Ltd.-Dazhi FengHue construction project on May 5, 2013
   Groundbreaking Ceremony Palace Ocean (Tien-Yi) residence construction project on Apr. 3, 2013
   Groundbreaking Ceremony for YuanShan No.1 residence project on Feb. 27, 2013
   Groundbreaking Ceremony for Ambassador residence construction project on Jan. 2, 2013
   Groundbreaking Ceremony for DingHe Development Co. Ltd.- DingHe Garden residence project on Dec. 7, 2012
   Groundbreaking Ceremony for Dazhi No.1 residence project on Sep. 26, 2012
   Beam-raising Ceremony for TransGlobe Life Insurance Inc. HQ building project on Aug. 18, 2012
   2010/12 Project PresedentVilla was lauched.
   2009/08 The Residences Mandarin Oriental Taipei was lauched
   2009/04 MOTP hold main-beam setting.
   2009/07 DA-LI He-Mei mansions was launched.
   2009/06 Sanyo Plant hold the main-bean setting.
   2009/02 MRT Line's Taipei Couty Section launched.
   The CTCB costruction launching ceremony on Jan 15.
   July, 2008- Main Beam Setting Ceremony of Chlitina Hsin-Yi Building Construction
   June 2008 - New Construction Launching Ceremony of Jade Garden River Side Mansion
   September 2007 - New Construction Launching Ceremony of Cozy Living By LWM Architects Mansion
   May, 2007 - 450A MRT system Construction - the operation launching ceremony will be held on May 2nd
   Work on airport MRT's Taipei section starts.
   2006, August- Beginning of the Taipei Metropolitan MRT System CG590C Section Bidding Construction of Sung-San Line
  
  
  

Back

  
   Da Cin | Da Cin Basketball Team Accumulated Visitors of this Website 1020362
   DACIN Construction Co.Ltd  Address 9F., No.92, Sec. 2, Dunhua S. Rd., Da-an District, Taipei City  TEL +886-2-2706-2929
Copyright reserved c 2007 DA CIN Construction Co ., Ltd. All Rights Reserved.