Concrete Fill in Tube
Far Eastern Plaza is the first office skyscraper that has been built independently by the domestic contractor. It is built with 41 floors (166.2 m in Height) and 5 basements (17.9 m in Depth). One of the most difficult work items is concrete fill in tube; it is required to deliver the concrete by pumping cart up into the steel columns of 70 meters high; it has created the trend of high elevation pumping of concrete as a domestic pioneer.
  
PC partition wall Technique
PC partition wall technique is developed for the construction of slurry wall when encountered existing foundations or underground obstacles. It provides a safe and effective solution for urban renovation project in the city.
  
TBM drives through the existing retaining Structur
The Taipei MRT CK570B project constructed by Da Cin Co. Ltd. has adopted as a domestic pioneer that the advanced TBM drives through the existing retaining structures which are underneath the tunnels of Taiwan Railway and Taiwan High Speed Rail. The drilling of the shield tunnel should not have any impacts to the operation of Taiwan Railway and to the safety of the tracks of THSR. The technical requirements of the TBM are relatively high in this particular case, and thus this breakthrough has been acknowledged as a milestone in the industry. .
  
Top-Down Construction Approach
Contrary to the traditional method, the super structure and the basement of the building are allowed to construct simultaneously prior to the completion of the foundation slab in the top-down technique. Construction time is shortened and hence, the operation date of the project can be advanced significantly. Also, it provides a safe constructing approach for underground deep excavation. A technical threshold exists for this particular method because of the strict requirements of the craftsmanship and quality. Da Cin has successfully completed numerous top-down construction projects which is expected as the pioneer in the industry. The top down project with the deepest excavation depth is the TaiShin Building of GL - 26.2 Meters.
  
Waffle Slab
The sophisticated equipments and machines used in the high-tech plant must be installed on the flat floor surface of neatness and smoothness for producing the products that could meet the precision criteria. The construction techniques used for the waffle slab by the company have been acquired the appreciation and positive affirmation from the clients.
  
  
  
  
  

Back

  
   Da Cin | Da Cin Basketball Team Accumulated Visitors of this Website 1020323
   DACIN Construction Co.Ltd  Address 9F., No.92, Sec. 2, Dunhua S. Rd., Da-an District, Taipei City  TEL +886-2-2706-2929
Copyright reserved c 2007 DA CIN Construction Co ., Ltd. All Rights Reserved.